Wood ST over Ditch
FairMontgomery County, Illinois · Hillsboro · Structure no. 068600500000000
- Built
- 1920
- 105 years old
- Condition
- Fair
- inspected February 2023
- Type
- Tee Beam
- Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 850
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Wood ST over Ditch is a concrete tee beam carrying Wood ST over Ditch in Montgomery County, Illinois. It was built in 1920, so it is 105 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 850 vehicles a day, roughly 11% of them trucks, projected to reach 859 by 2046. The structure is 44 ft (13.4 m) long and 33 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wood ST over Ditch built?
It was built in 1920, making it 105 years old in 2025.
What condition is Wood ST over Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Wood ST over Ditch carry?
About 850 vehicles per day (2020 count), of which roughly 11% are trucks.
How long is Wood ST over Ditch?
The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 33 ft wide.
Who owns Wood ST over Ditch?
It is owned by the City or Municipal Highway Agency.