US Bridges

TR 69/TROUT Camp R over Bond Creek

Good

Monroe County, Illinois · 2 MI NE Valmeyer · Structure no. 067315600000000

Built
1996
29 years old
Condition
Good
inspected February 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
300
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 69/TROUT Camp R over Bond Creek is a prestressed concrete box beam or girders - multiple carrying TR 69/TROUT Camp R over Bond Creek in Monroe County, Illinois. It was built in 1996, so it is 29 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 11% of them trucks, projected to reach 283 by 2046. The structure is 61 ft (18.7 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 69/TROUT Camp R
CrossesBond Creek
Location2 MI NE Valmeyer
RouteCounty Highway 0
Coordinates38.32266, -90.24509
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length61 ft (18.7 m)
Longest span59 ft (18 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2024)
Projected traffic283 by 2046
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 69/TROUT Camp R over Bond Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is TR 69/TROUT Camp R over Bond Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2022.

How much traffic does TR 69/TROUT Camp R over Bond Creek carry?

About 300 vehicles per day (2024 count), of which roughly 11% are trucks.

How long is TR 69/TROUT Camp R over Bond Creek?

The structure is 61 ft (18.7 m) long with a longest span of 59 ft (18 m) and a deck 24 ft wide.

Who owns TR 69/TROUT Camp R over Bond Creek?

It is owned by the Town or Township Highway Agency.