IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B
FairMonroe County, Illinois · North of Columbia · Structure no. 067002900000000
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 153 ft
- 1 main span
- Daily traffic
- 36,900
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B is a steel stringer/multi-beam or girder carrying IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B in Monroe County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 36,900 vehicles a day, roughly 8% of them trucks, projected to reach 14,125 by 2046. The structure is 153 ft (46.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B built?
It was built in 1982, making it 43 years old in 2025.
What condition is IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B carry?
About 36,900 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B?
The structure is 153 ft (46.5 m) long with a longest span of 152 ft (46.3 m) and a deck 43 ft wide.
Who owns IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B?
It is owned by the State Highway Agency.