FAS 212 (ch 9) over Camp Creek
GoodMercer County, Illinois · NW-8-T14NR4W · Structure no. 066316500000000
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 325
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 212 (ch 9) over Camp Creek is a prestressed concrete continuous box beam or girders - multiple carrying FAS 212 (ch 9) over Camp Creek in Mercer County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 325 vehicles a day, roughly 37% of them trucks, projected to reach 303 by 2046. The structure is 120 ft (36.6 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 212 (ch 9) over Camp Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is FAS 212 (ch 9) over Camp Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does FAS 212 (ch 9) over Camp Creek carry?
About 325 vehicles per day (2024 count), of which roughly 37% are trucks.
How long is FAS 212 (ch 9) over Camp Creek?
The structure is 120 ft (36.6 m) long with a longest span of 42 ft (12.8 m) and a deck 30 ft wide.
Who owns FAS 212 (ch 9) over Camp Creek?
It is owned by the County Highway Agency.