US Bridges

FAS 206-CH 4 over Parker Run

Poor

Mercer County, Illinois · SE-36-T15NR1W · Structure no. 066311300000000

Built
1976
49 years old
Condition
Poor
inspected December 2024
Type
Channel Beam
Concrete
Length
37 ft
1 main span
Daily traffic
775
2024 count
Owner
County
County Highway Agency

About this bridge

FAS 206-CH 4 over Parker Run is a concrete channel beam carrying FAS 206-CH 4 over Parker Run in Mercer County, Illinois. It was built in 1976, so it is 49 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 775 vehicles a day, roughly 8% of them trucks, projected to reach 960 by 2046. The structure is 37 ft (11.4 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesFAS 206-CH 4
CrossesParker Run
LocationSE-36-T15NR1W
RouteCounty Highway 0
Coordinates41.24413, -90.44446
Functional classRural Major Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52.9 US tons
Inventory rating31.7 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length37 ft (11.4 m)
Longest span35 ft (10.7 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic775 (2024)
Projected traffic960 by 2046
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 206-CH 4 over Parker Run built?

It was built in 1976, making it 49 years old in 2025.

What condition is FAS 206-CH 4 over Parker Run in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.

How much traffic does FAS 206-CH 4 over Parker Run carry?

About 775 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is FAS 206-CH 4 over Parker Run?

The structure is 37 ft (11.4 m) long with a longest span of 35 ft (10.7 m) and a deck 30 ft wide.

Who owns FAS 206-CH 4 over Parker Run?

It is owned by the County Highway Agency.