I-24 Ramp 259 over New Columbia Ditch
FairMassac County, Illinois · New Columbia Interch · Structure no. 064003800000000
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 133 ft
- 3 main spans
- Daily traffic
- 250
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-24 Ramp 259 over New Columbia Ditch is a steel continuous stringer/multi-beam or girder carrying I-24 Ramp 259 over New Columbia Ditch in Massac County, Illinois. It was built in 1978, so it is 47 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 250 vehicles a day, roughly 36% of them trucks, projected to reach 606 by 2046. The structure is 133 ft (40.4 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-24 Ramp 259 over New Columbia Ditch built?
It was built in 1978, making it 47 years old in 2025.
What condition is I-24 Ramp 259 over New Columbia Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does I-24 Ramp 259 over New Columbia Ditch carry?
About 250 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is I-24 Ramp 259 over New Columbia Ditch?
The structure is 133 ft (40.4 m) long with a longest span of 47 ft (14.4 m) and a deck 28 ft wide.
Who owns I-24 Ramp 259 over New Columbia Ditch?
It is owned by the State Highway Agency.