US Bridges

TR 234 over Main Ditch

Good

Mason County, Illinois · 0.30 MI N TR 47 · Structure no. 063340500000000

Built
2018
7 years old
Condition
Good
inspected July 2021
Type
Stringer/Multi-beam or Girder
Steel
Length
93 ft
1 main span
Daily traffic
50
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 234 over Main Ditch is a steel stringer/multi-beam or girder carrying TR 234 over Main Ditch in Mason County, Illinois. It was built in 2018, so it is 7 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 93 ft (28.4 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 234
CrossesMain Ditch
Location0.30 MI N TR 47
RouteCounty Highway 0
Coordinates40.33779, -89.734
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating36.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length93 ft (28.4 m)
Longest span90 ft (27.4 m)
Deck width30 ft (9.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 234 over Main Ditch built?

It was built in 2018, making it 7 years old in 2025.

What condition is TR 234 over Main Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.

How much traffic does TR 234 over Main Ditch carry?

About 50 vehicles per day (2024 count).

How long is TR 234 over Main Ditch?

The structure is 93 ft (28.4 m) long with a longest span of 90 ft (27.4 m) and a deck 30 ft wide.

Who owns TR 234 over Main Ditch?

It is owned by the Town or Township Highway Agency.