TR 190 over Main Ditch
PoorMason County, Illinois · 2 MI SE Forest City · Structure no. 063330400000000
- Built
- 1972
- 53 years old
- Condition
- Poor
- inspected February 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 74 ft
- 3 main spans
- Daily traffic
- 50
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 190 over Main Ditch is a prestressed concrete box beam or girders - multiple carrying TR 190 over Main Ditch in Mason County, Illinois. It was built in 1972, so it is 53 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 50 vehicles a day, projected to reach 76 by 2046. The structure is 74 ft (22.6 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 190 over Main Ditch built?
It was built in 1972, making it 53 years old in 2025.
What condition is TR 190 over Main Ditch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2025.
How much traffic does TR 190 over Main Ditch carry?
About 50 vehicles per day (2024 count).
How long is TR 190 over Main Ditch?
The structure is 74 ft (22.6 m) long with a longest span of 25 ft (7.6 m) and a deck 26 ft wide.
Who owns TR 190 over Main Ditch?
It is owned by the Town or Township Highway Agency.