US Bridges

TR 82 over Crow Creek Trib

Good

Marshall County, Illinois · T29N-R2W-3PM Sec 27 · Structure no. 062484200000000

Built
2004
21 years old
Condition
Good
inspected April 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
71 ft
1 main span
Daily traffic
75
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 82 over Crow Creek Trib is a prestressed concrete box beam or girders - multiple carrying TR 82 over Crow Creek Trib in Marshall County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, roughly 7% of them trucks, projected to reach 76 by 2046. The structure is 71 ft (21.7 m) long and 27 ft wide.

CarriesTR 82
CrossesCrow Creek Trib
LocationT29N-R2W-3PM Sec 27
RouteCounty Highway 0
Coordinates40.94398, -89.31604
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length71 ft (21.7 m)
Longest span69 ft (21 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2024)
Projected traffic76 by 2046
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 82 over Crow Creek Trib built?

It was built in 2004, making it 21 years old in 2025.

What condition is TR 82 over Crow Creek Trib in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2021.

How much traffic does TR 82 over Crow Creek Trib carry?

About 75 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is TR 82 over Crow Creek Trib?

The structure is 71 ft (21.7 m) long with a longest span of 69 ft (21 m) and a deck 27 ft wide.

Who owns TR 82 over Crow Creek Trib?

It is owned by the Town or Township Highway Agency.