TR-131 over E Fk Kaskaskia River
GoodMarion County, Illinois · 3 MI SW Patoka · Structure no. 061323200000000
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected March 2022
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 50
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR-131 over E Fk Kaskaskia River is a prestressed concrete box beam or girders - multiple carrying TR-131 over E Fk Kaskaskia River in Marion County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 50 vehicles a day, roughly 16% of them trucks, projected to reach 51 by 2046. The structure is 120 ft (36.6 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR-131 over E Fk Kaskaskia River built?
It was built in 1982, making it 43 years old in 2025.
What condition is TR-131 over E Fk Kaskaskia River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.
How much traffic does TR-131 over E Fk Kaskaskia River carry?
About 50 vehicles per day (2022 count), of which roughly 16% are trucks.
How long is TR-131 over E Fk Kaskaskia River?
The structure is 120 ft (36.6 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.
Who owns TR-131 over E Fk Kaskaskia River?
It is owned by the Town or Township Highway Agency.