US Bridges

FAS 766/FRUIT RD over Sugar Fork

Good

Madison County, Illinois · 4.7 W Grantfork · Structure no. 060334300000000

Built
2007
18 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
92 ft
3 main spans
Daily traffic
375
2021 count
Owner
County
County Highway Agency

About this bridge

FAS 766/FRUIT RD over Sugar Fork is a prestressed concrete box beam or girders - multiple carrying FAS 766/FRUIT RD over Sugar Fork in Madison County, Illinois. It was built in 2007, so it is 18 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 375 vehicles a day, roughly 16% of them trucks, projected to reach 401 by 2046. The structure is 92 ft (27.9 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesFAS 766/FRUIT RD
CrossesSugar Fork
Location4.7 W Grantfork
RouteCounty Highway 0
Coordinates38.82986, -89.75641
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length92 ft (27.9 m)
Longest span40 ft (12.2 m)
Deck width33 ft (10.1 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic375 (2021)
Projected traffic401 by 2046
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAS 766/FRUIT RD over Sugar Fork built?

It was built in 2007, making it 18 years old in 2025.

What condition is FAS 766/FRUIT RD over Sugar Fork in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does FAS 766/FRUIT RD over Sugar Fork carry?

About 375 vehicles per day (2021 count), of which roughly 16% are trucks.

How long is FAS 766/FRUIT RD over Sugar Fork?

The structure is 92 ft (27.9 m) long with a longest span of 40 ft (12.2 m) and a deck 33 ft wide.

Who owns FAS 766/FRUIT RD over Sugar Fork?

It is owned by the County Highway Agency.