US Bridges

Culp Lane/ TR 117 over Rocky Branch Creek C

Fair

Madison County, Illinois · .8 MI North Bethalto · Structure no. 060329000000000

Built
1986
39 years old
Condition
Fair
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
82 ft
3 main spans
Daily traffic
1,400
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Culp Lane/ TR 117 over Rocky Branch Creek C is a prestressed concrete box beam or girders - multiple carrying Culp Lane/ TR 117 over Rocky Branch Creek C in Madison County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,400 vehicles a day, roughly 6% of them trucks, projected to reach 1,498 by 2046. The structure is 82 ft (25 m) long and 28 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesCulp Lane/ TR 117
CrossesRocky Branch Creek C
Location.8 MI North Bethalto
RouteCounty Highway 0
Coordinates38.92768, -90.04506
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length82 ft (25 m)
Longest span30 ft (9.1 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,400 (2021)
Projected traffic1,498 by 2046
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Culp Lane/ TR 117 over Rocky Branch Creek C built?

It was built in 1986, making it 39 years old in 2025.

What condition is Culp Lane/ TR 117 over Rocky Branch Creek C in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Culp Lane/ TR 117 over Rocky Branch Creek C carry?

About 1,400 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is Culp Lane/ TR 117 over Rocky Branch Creek C?

The structure is 82 ft (25 m) long with a longest span of 30 ft (9.1 m) and a deck 28 ft wide.

Who owns Culp Lane/ TR 117 over Rocky Branch Creek C?

It is owned by the Town or Township Highway Agency.