FAU 8998/SEMINARY over Trib to Honey Br
GoodMadison County, Illinois · 1.0 MI N of Alton · Structure no. 060322900000000
- Built
- 1980
- 45 years old, rebuilt 2016
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 111 ft
- 3 main spans
- Daily traffic
- 5,400
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAU 8998/SEMINARY over Trib to Honey Br is a steel continuous stringer/multi-beam or girder carrying FAU 8998/SEMINARY over Trib to Honey Br in Madison County, Illinois. It was built in 1980 and reconstructed in 2016, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,400 vehicles a day, roughly 5% of them trucks, projected to reach 5,671 by 2046. The structure is 111 ft (33.8 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 8998/SEMINARY over Trib to Honey Br built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2016.
What condition is FAU 8998/SEMINARY over Trib to Honey Br in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does FAU 8998/SEMINARY over Trib to Honey Br carry?
About 5,400 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is FAU 8998/SEMINARY over Trib to Honey Br?
The structure is 111 ft (33.8 m) long with a longest span of 41 ft (12.6 m) and a deck 43 ft wide.
Who owns FAU 8998/SEMINARY over Trib to Honey Br?
It is owned by the County Highway Agency.