US Bridges

FAI 55 over Trib to Silver Creek

Fair

Madison County, Illinois · 0.24 MI S of Ill 4 · Structure no. 060201500000000

Built
1971
54 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete Continuous
Length
25 ft
2 main spans
Daily traffic
31,500
2023 count
Owner
State
State Highway Agency

About this bridge

FAI 55 over Trib to Silver Creek is a concrete continuous culvert carrying FAI 55 over Trib to Silver Creek in Madison County, Illinois. It was built in 1971, so it is 54 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 31,500 vehicles a day, roughly 26% of them trucks, projected to reach 35,845 by 2046. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 8.1 mi (13 km).

CarriesFAI 55
CrossesTrib to Silver Creek
Location0.24 MI S of Ill 4
RouteInterstate 55
Coordinates38.93035, -89.80255
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating80.4 US tons
Inventory rating48.2 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,500 (2023)
Projected traffic35,845 by 2046
Trucks26%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAI 55 over Trib to Silver Creek built?

It was built in 1971, making it 54 years old in 2025.

What condition is FAI 55 over Trib to Silver Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does FAI 55 over Trib to Silver Creek carry?

About 31,500 vehicles per day (2023 count), of which roughly 26% are trucks.

How long is FAI 55 over Trib to Silver Creek?

The structure is 25 ft (7.6 m) long with a longest span of 11 ft (3.4 m).

Who owns FAI 55 over Trib to Silver Creek?

It is owned by the State Highway Agency.