US Bridges

Il 255 SB - FAP 31 over Il 111/IL 267

Good

Madison County, Illinois · At Godfrey · Structure no. 060033100000000

Built
2012
13 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
143 ft
1 main span
Daily traffic
6,500
2023 count
Owner
State
State Highway Agency

About this bridge

Il 255 SB - FAP 31 over Il 111/IL 267 is a steel stringer/multi-beam or girder carrying Il 255 SB - FAP 31 over Il 111/IL 267 in Madison County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,500 vehicles a day, roughly 10% of them trucks, projected to reach 3,718 by 2046. The structure is 143 ft (43.5 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIl 255 SB - FAP 31
CrossesIl 111/IL 267
LocationAt Godfrey
RouteState Highway 255
Coordinates38.97038, -90.18927
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating59.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length143 ft (43.5 m)
Longest span141 ft (43 m)
Deck width43 ft (13 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,500 (2023)
Projected traffic3,718 by 2046
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Il 255 SB - FAP 31 over Il 111/IL 267 built?

It was built in 2012, making it 13 years old in 2025.

What condition is Il 255 SB - FAP 31 over Il 111/IL 267 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Il 255 SB - FAP 31 over Il 111/IL 267 carry?

About 6,500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Il 255 SB - FAP 31 over Il 111/IL 267?

The structure is 143 ft (43.5 m) long with a longest span of 141 ft (43 m) and a deck 43 ft wide.

Who owns Il 255 SB - FAP 31 over Il 111/IL 267?

It is owned by the State Highway Agency.