US Bridges

Stutz LN FAU 9009 over Il 255 FAP 310

Good

Madison County, Illinois · 1.6 MI N of Il 140 · Structure no. 060031200000000

Built
2005
20 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
178 ft
2 main spans
Daily traffic
500
2021 count
Owner
State
State Highway Agency

About this bridge

Stutz LN FAU 9009 over Il 255 FAP 310 is a steel continuous stringer/multi-beam or girder carrying Stutz LN FAU 9009 over Il 255 FAP 310 in Madison County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 6% of them trucks, projected to reach 535 by 2046. The structure is 178 ft (54.4 m) long and 37 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesStutz LN FAU 9009
CrossesIl 255 FAP 310
Location1.6 MI N of Il 140
Coordinates38.93149, -90.08936
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating73.2 US tons
Inventory rating44 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length178 ft (54.4 m)
Longest span93 ft (28.2 m)
Deck width37 ft (11.2 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2021)
Projected traffic535 by 2046
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stutz LN FAU 9009 over Il 255 FAP 310 built?

It was built in 2005, making it 20 years old in 2025.

What condition is Stutz LN FAU 9009 over Il 255 FAP 310 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Stutz LN FAU 9009 over Il 255 FAP 310 carry?

About 500 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is Stutz LN FAU 9009 over Il 255 FAP 310?

The structure is 178 ft (54.4 m) long with a longest span of 93 ft (28.2 m) and a deck 37 ft wide.

Who owns Stutz LN FAU 9009 over Il 255 FAP 310?

It is owned by the State Highway Agency.