Il 255 SB (FAP310S over New Poag Rd/Levee RD
GoodMadison County, Illinois · 2.70 MI North of 270 · Structure no. 060027700000000
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 182 ft
- 3 main spans
- Daily traffic
- 33,700
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 255 SB (FAP310S over New Poag Rd/Levee RD is a steel continuous stringer/multi-beam or girder carrying Il 255 SB (FAP310S over New Poag Rd/Levee RD in Madison County, Illinois. It was built in 1995, so it is 30 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 33,700 vehicles a day, roughly 13% of them trucks, projected to reach 18,297 by 2046. The structure is 182 ft (55.4 m) long and 45 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 255 SB (FAP310S over New Poag Rd/Levee RD built?
It was built in 1995, making it 30 years old in 2025.
What condition is Il 255 SB (FAP310S over New Poag Rd/Levee RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Il 255 SB (FAP310S over New Poag Rd/Levee RD carry?
About 33,700 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is Il 255 SB (FAP310S over New Poag Rd/Levee RD?
The structure is 182 ft (55.4 m) long with a longest span of 66 ft (20 m) and a deck 45 ft wide.
Who owns Il 255 SB (FAP310S over New Poag Rd/Levee RD?
It is owned by the State Highway Agency.