Poag Road/Fau 8877 over Mct Goshen Trail
GoodMadison County, Illinois · 1 M W Il 157 · Structure no. 060018300000000
- Built
- 1966
- 59 years old, rebuilt 2020
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 144 ft
- 3 main spans
- Daily traffic
- 4,900
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Poag Road/Fau 8877 over Mct Goshen Trail is a steel continuous stringer/multi-beam or girder carrying Poag Road/Fau 8877 over Mct Goshen Trail in Madison County, Illinois. It was built in 1966 and reconstructed in 2020, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,900 vehicles a day, roughly 4% of them trucks, projected to reach 4,387 by 2046. The structure is 144 ft (44 m) long and 67 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Poag Road/Fau 8877 over Mct Goshen Trail built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2020.
What condition is Poag Road/Fau 8877 over Mct Goshen Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Poag Road/Fau 8877 over Mct Goshen Trail carry?
About 4,900 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Poag Road/Fau 8877 over Mct Goshen Trail?
The structure is 144 ft (44 m) long with a longest span of 52 ft (15.8 m) and a deck 67 ft wide.
Who owns Poag Road/Fau 8877 over Mct Goshen Trail?
It is owned by the County Highway Agency.