US Bridges

FAI 70 EB over Silver Creek

Fair

Madison County, Illinois · 2.3 M W Ill 4 · Structure no. 060002500000000

Built
1962
63 years old, rebuilt 1988
Condition
Fair
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
187 ft
3 main spans
Daily traffic
15,300
2023 count
Owner
State
State Highway Agency

About this bridge

FAI 70 EB over Silver Creek is a steel continuous stringer/multi-beam or girder carrying FAI 70 EB over Silver Creek in Madison County, Illinois. It was built in 1962 and reconstructed in 1988, so it is 63 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,300 vehicles a day, roughly 36% of them trucks, projected to reach 17,388 by 2046. The structure is 187 ft (57 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAI 70 EB
CrossesSilver Creek
Location2.3 M W Ill 4
RouteInterstate 70
Coordinates38.75768, -89.84165
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.4 US tons
Inventory rating36.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length187 ft (57 m)
Longest span68 ft (20.7 m)
Deck width37 ft (11.3 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,300 (2023)
Projected traffic17,388 by 2046
Trucks36%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$514,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FAI 70 EB over Silver Creek built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 1988.

What condition is FAI 70 EB over Silver Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.

How much traffic does FAI 70 EB over Silver Creek carry?

About 15,300 vehicles per day (2023 count), of which roughly 36% are trucks.

How long is FAI 70 EB over Silver Creek?

The structure is 187 ft (57 m) long with a longest span of 68 ft (20.7 m) and a deck 37 ft wide.

Who owns FAI 70 EB over Silver Creek?

It is owned by the State Highway Agency.