US Bridges

Ch 29 over FAI 55

Good

Macoupin County, Illinois · 4.0MI S I-55/IL 16 · Structure no. 059003700000000

Built
1973
52 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
280 ft
2 main spans
Daily traffic
175
2021 count
Owner
State
State Highway Agency

About this bridge

Ch 29 over FAI 55 is a steel continuous stringer/multi-beam or girder carrying Ch 29 over FAI 55 in Macoupin County, Illinois. It was built in 1973, so it is 52 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 175 vehicles a day, roughly 35% of them trucks, projected to reach 177 by 2046. The structure is 280 ft (85.3 m) long and 30 ft wide.

CarriesCh 29
CrossesFAI 55
Location4.0MI S I-55/IL 16
RouteCounty Highway 0
Coordinates39.12066, -89.71948
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.8 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 15
Structure length280 ft (85.3 m)
Longest span104 ft (31.7 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic175 (2021)
Projected traffic177 by 2046
Trucks35%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ch 29 over FAI 55 built?

It was built in 1973, making it 52 years old in 2025.

What condition is Ch 29 over FAI 55 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Ch 29 over FAI 55 carry?

About 175 vehicles per day (2021 count), of which roughly 35% are trucks.

How long is Ch 29 over FAI 55?

The structure is 280 ft (85.3 m) long with a longest span of 104 ft (31.7 m) and a deck 30 ft wide.

Who owns Ch 29 over FAI 55?

It is owned by the State Highway Agency.