FAP 710(NB Bs Rt 5 over FAP 322(US 51)
FairMacon County, Illinois · 2 MI S of Elwin · Structure no. 058012200000000
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 300 ft
- 2 main spans
- Daily traffic
- 5,300
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FAP 710(NB Bs Rt 5 over FAP 322(US 51) is a prestressed concrete continuous stringer/multi-beam or girder carrying FAP 710(NB Bs Rt 5 over FAP 322(US 51) in Macon County, Illinois. It was built in 1994, so it is 31 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,300 vehicles a day, roughly 10% of them trucks, projected to reach 5,353 by 2046. The structure is 300 ft (91.4 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAP 710(NB Bs Rt 5 over FAP 322(US 51) built?
It was built in 1994, making it 31 years old in 2025.
What condition is FAP 710(NB Bs Rt 5 over FAP 322(US 51) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does FAP 710(NB Bs Rt 5 over FAP 322(US 51) carry?
About 5,300 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is FAP 710(NB Bs Rt 5 over FAP 322(US 51)?
The structure is 300 ft (91.4 m) long with a longest span of 105 ft (32 m) and a deck 43 ft wide.
Who owns FAP 710(NB Bs Rt 5 over FAP 322(US 51)?
It is owned by the State Highway Agency.