Ch 26 (woodford CO over Evergreen Lake Spilw
GoodMcLean County, Illinois · 2.5 Mile NW of Hudso · Structure no. 102700000000000
- Built
- 1970
- 55 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 156 ft
- 3 main spans
- Daily traffic
- 350
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Ch 26 (woodford CO over Evergreen Lake Spilw is a prestressed concrete box beam or girders - multiple carrying Ch 26 (woodford CO over Evergreen Lake Spilw in McLean County, Illinois. It was built in 1970, so it is 55 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 350 vehicles a day, roughly 10% of them trucks, projected to reach 354 by 2046. The structure is 156 ft (47.6 m) long and 34 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 26 (woodford CO over Evergreen Lake Spilw built?
It was built in 1970, making it 55 years old in 2025.
What condition is Ch 26 (woodford CO over Evergreen Lake Spilw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Ch 26 (woodford CO over Evergreen Lake Spilw carry?
About 350 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Ch 26 (woodford CO over Evergreen Lake Spilw?
The structure is 156 ft (47.6 m) long with a longest span of 51 ft (15.5 m) and a deck 34 ft wide.
Who owns Ch 26 (woodford CO over Evergreen Lake Spilw?
It is owned by the City or Municipal Highway Agency.