FAI 74 over Ditch
GoodMcLean County, Illinois · W of Carlock · Structure no. 057853900000000
- Built
- 1966
- 59 years old
- Condition
- Good
- inspected May 2024
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 3 main spans
- Daily traffic
- 28,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FAI 74 over Ditch is a concrete culvert carrying FAI 74 over Ditch in McLean County, Illinois. It was built in 1966, so it is 59 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 28,400 vehicles a day, roughly 18% of them trucks, projected to reach 27,371 by 2046. The structure is 30 ft (9.1 m) long.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAI 74 over Ditch built?
It was built in 1966, making it 59 years old in 2025.
What condition is FAI 74 over Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does FAI 74 over Ditch carry?
About 28,400 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is FAI 74 over Ditch?
The structure is 30 ft (9.1 m) long with a longest span of 7 ft (2.1 m).
Who owns FAI 74 over Ditch?
It is owned by the State Highway Agency.