Linden/Fau 6405 over Sugar CR Main Branch
GoodMcLean County, Illinois · 0.75 MI NE 150 & 51 · Structure no. 057631900000000
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected February 2023
- Type
- Slab
- Concrete Continuous
- Length
- 84 ft
- 3 main spans
- Daily traffic
- 3,175
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Linden/Fau 6405 over Sugar CR Main Branch is a concrete continuous slab carrying Linden/Fau 6405 over Sugar CR Main Branch in McLean County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,175 vehicles a day, roughly 1% of them trucks, projected to reach 2,954 by 2046. The structure is 84 ft (25.6 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Linden/Fau 6405 over Sugar CR Main Branch built?
It was built in 1982, making it 43 years old in 2025.
What condition is Linden/Fau 6405 over Sugar CR Main Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Linden/Fau 6405 over Sugar CR Main Branch carry?
About 3,175 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Linden/Fau 6405 over Sugar CR Main Branch?
The structure is 84 ft (25.6 m) long with a longest span of 31 ft (9.4 m) and a deck 58 ft wide.
Who owns Linden/Fau 6405 over Sugar CR Main Branch?
It is owned by the City or Municipal Highway Agency.