TR 475 over Middle Br Easterbr.
GoodMcLean County, Illinois · 3 MI NW Bellflower · Structure no. 057573300000000
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected March 2024
- Type
- Channel Beam
- Concrete
- Length
- 62 ft
- 3 main spans
- Daily traffic
- 75
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 475 over Middle Br Easterbr. is a concrete channel beam carrying TR 475 over Middle Br Easterbr. in McLean County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 3% of them trucks, projected to reach 76 by 2046. The structure is 62 ft (18.9 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 475 over Middle Br Easterbr. built?
It was built in 2005, making it 20 years old in 2025.
What condition is TR 475 over Middle Br Easterbr. in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does TR 475 over Middle Br Easterbr. carry?
About 75 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is TR 475 over Middle Br Easterbr.?
The structure is 62 ft (18.9 m) long with a longest span of 20 ft (6.1 m) and a deck 26 ft wide.
Who owns TR 475 over Middle Br Easterbr.?
It is owned by the Town or Township Highway Agency.