FAS 473 Ch 8 over Turkey Creek
FairMcLean County, Illinois · W Edge Lexington · Structure no. 057490300000000
- Built
- 1946
- 79 years old, rebuilt 1997
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 158 ft
- 3 main spans
- Daily traffic
- 3,100
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 473 Ch 8 over Turkey Creek is a steel continuous stringer/multi-beam or girder carrying FAS 473 Ch 8 over Turkey Creek in McLean County, Illinois. It was built in 1946 and reconstructed in 1997, so it is 79 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,100 vehicles a day, roughly 9% of them trucks, projected to reach 2,778 by 2046. The structure is 158 ft (48.2 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 473 Ch 8 over Turkey Creek built?
It was built in 1946, making it 79 years old in 2025. It was reconstructed in 1997.
What condition is FAS 473 Ch 8 over Turkey Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAS 473 Ch 8 over Turkey Creek carry?
About 3,100 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is FAS 473 Ch 8 over Turkey Creek?
The structure is 158 ft (48.2 m) long with a longest span of 63 ft (19.2 m) and a deck 32 ft wide.
Who owns FAS 473 Ch 8 over Turkey Creek?
It is owned by the County Highway Agency.