TR 5 (020 Inv.Co) over N.Fork Salt Creek
GoodMcLean County, Illinois · 4.0 MI S Leroy · Structure no. 057442800000000
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected March 2021
- Type
- Slab
- Concrete Continuous
- Length
- 161 ft
- 4 main spans
- Daily traffic
- 75
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 5 (020 Inv.Co) over N.Fork Salt Creek is a concrete continuous slab carrying TR 5 (020 Inv.Co) over N.Fork Salt Creek in McLean County, Illinois. It was built in 1997, so it is 28 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 75 vehicles a day, roughly 1% of them trucks, projected to reach 76 by 2046. The structure is 161 ft (49 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 5 (020 Inv.Co) over N.Fork Salt Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is TR 5 (020 Inv.Co) over N.Fork Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2021.
How much traffic does TR 5 (020 Inv.Co) over N.Fork Salt Creek carry?
About 75 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is TR 5 (020 Inv.Co) over N.Fork Salt Creek?
The structure is 161 ft (49 m) long with a longest span of 44 ft (13.4 m) and a deck 26 ft wide.
Who owns TR 5 (020 Inv.Co) over N.Fork Salt Creek?
It is owned by the Town or Township Highway Agency.