FAS 481 Ch 32 over Middle Fork Sugar CR
GoodMcLean County, Illinois · 0.5 MI Ese Stanford · Structure no. 057304000000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 160 ft
- 3 main spans
- Daily traffic
- 1,100
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 481 Ch 32 over Middle Fork Sugar CR is a steel continuous stringer/multi-beam or girder carrying FAS 481 Ch 32 over Middle Fork Sugar CR in McLean County, Illinois. It was built in 2022, so it is 3 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, roughly 25% of them trucks, projected to reach 1,117 by 2032. The structure is 160 ft (48.8 m) long and 32 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 481 Ch 32 over Middle Fork Sugar CR built?
It was built in 2022, making it 3 years old in 2025.
What condition is FAS 481 Ch 32 over Middle Fork Sugar CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does FAS 481 Ch 32 over Middle Fork Sugar CR carry?
About 1,100 vehicles per day (2024 count), of which roughly 25% are trucks.
How long is FAS 481 Ch 32 over Middle Fork Sugar CR?
The structure is 160 ft (48.8 m) long with a longest span of 60 ft (18.3 m) and a deck 32 ft wide.
Who owns FAS 481 Ch 32 over Middle Fork Sugar CR?
It is owned by the County Highway Agency.