US Bridges

I-55 Nbl over EB I-74/SW Bloom.

Fair

McLean County, Illinois · JCT I-55 & I-74 · Structure no. 057025000000000

Built
2010
15 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
295 ft
3 main spans
Daily traffic
10,650
2023 count
Owner
State
State Highway Agency

About this bridge

I-55 Nbl over EB I-74/SW Bloom. is a steel continuous stringer/multi-beam or girder carrying I-55 Nbl over EB I-74/SW Bloom. in McLean County, Illinois. It was built in 2010, so it is 15 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,650 vehicles a day, roughly 39% of them trucks, projected to reach 10,959 by 2046. The structure is 295 ft (89.9 m) long and 45 ft wide.

CarriesI-55 Nbl
CrossesEB I-74/SW Bloom.
LocationJCT I-55 & I-74
RouteInterstate 55
Coordinates40.44374, -89.02134
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.7 US tons
Inventory rating50.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length295 ft (89.9 m)
Longest span122 ft (37.2 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,650 (2023)
Projected traffic10,959 by 2046
Trucks39%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-55 Nbl over EB I-74/SW Bloom. built?

It was built in 2010, making it 15 years old in 2025.

What condition is I-55 Nbl over EB I-74/SW Bloom. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does I-55 Nbl over EB I-74/SW Bloom. carry?

About 10,650 vehicles per day (2023 count), of which roughly 39% are trucks.

How long is I-55 Nbl over EB I-74/SW Bloom.?

The structure is 295 ft (89.9 m) long with a longest span of 122 ft (37.2 m) and a deck 45 ft wide.

Who owns I-55 Nbl over EB I-74/SW Bloom.?

It is owned by the State Highway Agency.