Deep Cut Road over Union Pacific RR
FairMcHenry County, Illinois · .7M N of Nelson RD · Structure no. 056316200000000
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 167 ft
- 3 main spans
- Daily traffic
- 100
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Deep Cut Road over Union Pacific RR is a prestressed concrete box beam or girders - multiple carrying Deep Cut Road over Union Pacific RR in McHenry County, Illinois. It was built in 2004, so it is 21 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 25% of them trucks, projected to reach 120 by 2046. The structure is 167 ft (50.8 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Deep Cut Road over Union Pacific RR built?
It was built in 2004, making it 21 years old in 2025.
What condition is Deep Cut Road over Union Pacific RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Deep Cut Road over Union Pacific RR carry?
About 100 vehicles per day (2017 count), of which roughly 25% are trucks.
How long is Deep Cut Road over Union Pacific RR?
The structure is 167 ft (50.8 m) long with a longest span of 64 ft (19.5 m) and a deck 32 ft wide.
Who owns Deep Cut Road over Union Pacific RR?
It is owned by the Town or Township Highway Agency.