US Bridges

Bay Road over Lily Lake Drain

Good

McHenry County, Illinois · 1.0 MI SE of Chapelh · Structure no. 056310600000000

Built
1968
57 years old, rebuilt 2018
Condition
Good
inspected October 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
110 ft
3 main spans
Daily traffic
6,200
2021 count
Owner
County
County Highway Agency

About this bridge

Bay Road over Lily Lake Drain is a prestressed concrete box beam or girders - multiple carrying Bay Road over Lily Lake Drain in McHenry County, Illinois. It was built in 1968 and reconstructed in 2018, so it is 57 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,200 vehicles a day, roughly 6% of them trucks, projected to reach 7,440 by 2046. The structure is 110 ft (33.4 m) long and 46 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesBay Road
CrossesLily Lake Drain
Location1.0 MI SE of Chapelh
Coordinates42.36542, -88.21977
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.2 US tons
Inventory rating45.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length110 ft (33.4 m)
Longest span36 ft (11 m)
Deck width46 ft (14.1 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,200 (2021)
Projected traffic7,440 by 2046
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bay Road over Lily Lake Drain built?

It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2018.

What condition is Bay Road over Lily Lake Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Bay Road over Lily Lake Drain carry?

About 6,200 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is Bay Road over Lily Lake Drain?

The structure is 110 ft (33.4 m) long with a longest span of 36 ft (11 m) and a deck 46 ft wide.

Who owns Bay Road over Lily Lake Drain?

It is owned by the County Highway Agency.