US Bridges

Il 23 over I- 90 Jane Adams

Good

McHenry County, Illinois · I-90 @ IL23 · Structure no. 056033100000000

Built
2017
8 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
281 ft
2 main spans
Daily traffic
3,250
2023 count
Owner
State
State Highway Agency

About this bridge

Il 23 over I- 90 Jane Adams is a prestressed concrete continuous stringer/multi-beam or girder carrying Il 23 over I- 90 Jane Adams in McHenry County, Illinois. It was built in 2017, so it is 8 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,250 vehicles a day, roughly 11% of them trucks, projected to reach 3,480 by 2046. The structure is 281 ft (85.6 m) long and 69 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIl 23
CrossesI- 90 Jane Adams
LocationI-90 @ IL23
RouteState Highway 23
Coordinates42.17761, -88.618
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length281 ft (85.6 m)
Longest span138 ft (42.2 m)
Deck width69 ft (21.1 m)
Roadway width66 ft (20.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,250 (2023)
Projected traffic3,480 by 2046
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Il 23 over I- 90 Jane Adams built?

It was built in 2017, making it 8 years old in 2025.

What condition is Il 23 over I- 90 Jane Adams in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Il 23 over I- 90 Jane Adams carry?

About 3,250 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is Il 23 over I- 90 Jane Adams?

The structure is 281 ft (85.6 m) long with a longest span of 138 ft (42.2 m) and a deck 69 ft wide.

Who owns Il 23 over I- 90 Jane Adams?

It is owned by the State Highway Agency.