US Bridges

TR 2 over Sugar Creek

Fair

Logan County, Illinois · 1.5 MI SW New Hollnd · Structure no. 054551400000000

Built
1986
39 years old
Condition
Fair
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
282 ft
5 main spans
Daily traffic
35
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 2 over Sugar Creek is a prestressed concrete box beam or girders - multiple carrying TR 2 over Sugar Creek in Logan County, Illinois. It was built in 1986, so it is 39 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 35 vehicles a day, roughly 14% of them trucks, projected to reach 37 by 2046. The structure is 282 ft (86 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTR 2
CrossesSugar Creek
Location1.5 MI SW New Hollnd
RouteCounty Highway 0
Coordinates40.16178, -89.60251
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans5
Design loadHS 20
Structure length282 ft (86 m)
Longest span60 ft (18.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2022)
Projected traffic37 by 2046
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 2 over Sugar Creek built?

It was built in 1986, making it 39 years old in 2025.

What condition is TR 2 over Sugar Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does TR 2 over Sugar Creek carry?

About 35 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is TR 2 over Sugar Creek?

The structure is 282 ft (86 m) long with a longest span of 60 ft (18.3 m) and a deck 24 ft wide.

Who owns TR 2 over Sugar Creek?

It is owned by the Town or Township Highway Agency.