TR 158 over Trib to Salt Creek
FairLogan County, Illinois · 4 MI S of Lincoln · Structure no. 054431200000000
- Built
- 2008
- 17 years old
- Condition
- Fair
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 59 ft
- 1 main span
- Daily traffic
- 75
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 158 over Trib to Salt Creek is a prestressed concrete box beam or girders - multiple carrying TR 158 over Trib to Salt Creek in Logan County, Illinois. It was built in 2008, so it is 17 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 75 vehicles a day, roughly 29% of them trucks, projected to reach 79 by 2046. The structure is 59 ft (17.9 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 158 over Trib to Salt Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is TR 158 over Trib to Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does TR 158 over Trib to Salt Creek carry?
About 75 vehicles per day (2022 count), of which roughly 29% are trucks.
How long is TR 158 over Trib to Salt Creek?
The structure is 59 ft (17.9 m) long with a longest span of 56 ft (17 m) and a deck 28 ft wide.
Who owns TR 158 over Trib to Salt Creek?
It is owned by the Town or Township Highway Agency.