US Bridges

I-55 NB over Race Street

Fair

Logan County, Illinois · .8M SW Atlanta Intch · Structure no. 054006500000000

Built
1976
49 years old, rebuilt 2015
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
121 ft
3 main spans
Daily traffic
11,600
2023 count
Owner
State
State Highway Agency

About this bridge

I-55 NB over Race Street is a steel continuous stringer/multi-beam or girder carrying I-55 NB over Race Street in Logan County, Illinois. It was built in 1976 and reconstructed in 2015, so it is 49 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,600 vehicles a day, roughly 31% of them trucks, projected to reach 12,495 by 2046. The structure is 121 ft (37 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-55 NB
CrossesRace Street
Location.8M SW Atlanta Intch
RouteInterstate 55
Coordinates40.25224, -89.23048
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating104.3 US tons
Inventory rating56.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length121 ft (37 m)
Longest span48 ft (14.6 m)
Deck width44 ft (13.3 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,600 (2023)
Projected traffic12,495 by 2046
Trucks31%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-55 NB over Race Street built?

It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2015.

What condition is I-55 NB over Race Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does I-55 NB over Race Street carry?

About 11,600 vehicles per day (2023 count), of which roughly 31% are trucks.

How long is I-55 NB over Race Street?

The structure is 121 ft (37 m) long with a longest span of 48 ft (14.6 m) and a deck 44 ft wide.

Who owns I-55 NB over Race Street?

It is owned by the State Highway Agency.