Il 121 over Salt Creek
FairLogan County, Illinois · 3.9M N IL54-MT Pul.* · Structure no. 054002100000000
- Built
- 1928
- 97 years old, rebuilt 1990
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 573 ft
- 3 main spans
- Daily traffic
- 3,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Il 121 over Salt Creek is a steel continuous stringer/multi-beam or girder carrying Il 121 over Salt Creek in Logan County, Illinois. It was built in 1928 and reconstructed in 1990, so it is 97 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,500 vehicles a day, roughly 19% of them trucks, projected to reach 3,728 by 2046. The structure is 573 ft (174.7 m) long and 35 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Il 121 over Salt Creek built?
It was built in 1928, making it 97 years old in 2025. It was reconstructed in 1990.
What condition is Il 121 over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Il 121 over Salt Creek carry?
About 3,500 vehicles per day (2023 count), of which roughly 19% are trucks.
How long is Il 121 over Salt Creek?
The structure is 573 ft (174.7 m) long with a longest span of 69 ft (21 m) and a deck 35 ft wide.
Who owns Il 121 over Salt Creek?
It is owned by the State Highway Agency.