US Bridges

TR 149 (1500) over Trib to Verillion

Good

Livingston County, Illinois · 1500 N 2205E · Structure no. 053422700000000

Built
2019
6 years old
Condition
Good
inspected September 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
53 ft
1 main span
Daily traffic
100
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 149 (1500) over Trib to Verillion is a prestressed concrete box beam or girders - multiple carrying TR 149 (1500) over Trib to Verillion in Livingston County, Illinois. It was built in 2019, so it is 6 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 30% of them trucks, projected to reach 101 by 2046. The structure is 53 ft (16.3 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTR 149 (1500)
CrossesTrib to Verillion
Location1500 N 2205E
RouteCounty Highway 0
Coordinates40.84612, -88.50764
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.8 US tons
Inventory rating60 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length53 ft (16.3 m)
Longest span51 ft (15.5 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic101 by 2046
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 149 (1500) over Trib to Verillion built?

It was built in 2019, making it 6 years old in 2025.

What condition is TR 149 (1500) over Trib to Verillion in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does TR 149 (1500) over Trib to Verillion carry?

About 100 vehicles per day (2023 count), of which roughly 30% are trucks.

How long is TR 149 (1500) over Trib to Verillion?

The structure is 53 ft (16.3 m) long with a longest span of 51 ft (15.5 m) and a deck 27 ft wide.

Who owns TR 149 (1500) over Trib to Verillion?

It is owned by the Town or Township Highway Agency.