US Bridges

TR 212 over Trib to Vermilion Ri

Good

Livingston County, Illinois · 1085N 2400E · Structure no. 053417300000000

Built
2005
20 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
49 ft
1 main span
Daily traffic
125
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 212 over Trib to Vermilion Ri is a prestressed concrete box beam or girders - multiple carrying TR 212 over Trib to Vermilion Ri in Livingston County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, roughly 42% of them trucks, projected to reach 303 by 2046. The structure is 49 ft (15 m) long and 27 ft wide.

CarriesTR 212
CrossesTrib to Vermilion Ri
Location1085N 2400E
RouteCounty Highway 0
Coordinates40.78616, -88.46925
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length49 ft (15 m)
Longest span49 ft (15 m)
Deck width27 ft (8.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2023)
Projected traffic303 by 2046
Trucks42%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 212 over Trib to Vermilion Ri built?

It was built in 2005, making it 20 years old in 2025.

What condition is TR 212 over Trib to Vermilion Ri in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does TR 212 over Trib to Vermilion Ri carry?

About 125 vehicles per day (2023 count), of which roughly 42% are trucks.

How long is TR 212 over Trib to Vermilion Ri?

The structure is 49 ft (15 m) long with a longest span of 49 ft (15 m) and a deck 27 ft wide.

Who owns TR 212 over Trib to Vermilion Ri?

It is owned by the Town or Township Highway Agency.