US Bridges

TR 135 over Felky Slough

Fair

Livingston County, Illinois · 2355 E 1700 N · Structure no. 053406800000000

Built
1983
42 years old
Condition
Fair
inspected June 2024
Type
Channel Beam
Concrete
Length
155 ft
4 main spans
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 135 over Felky Slough is a concrete channel beam carrying TR 135 over Felky Slough in Livingston County, Illinois. It was built in 1983, so it is 42 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 155 ft (47.1 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesTR 135
CrossesFelky Slough
Location2355 E 1700 N
RouteCounty Highway 0
Coordinates40.87566, -88.47952
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating58.2 US tons
Inventory rating34.6 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHS 20
Structure length155 ft (47.1 m)
Longest span37 ft (11.3 m)
Deck width26 ft (8 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic51 by 2046
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 135 over Felky Slough built?

It was built in 1983, making it 42 years old in 2025.

What condition is TR 135 over Felky Slough in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does TR 135 over Felky Slough carry?

About 50 vehicles per day (2023 count).

How long is TR 135 over Felky Slough?

The structure is 155 ft (47.1 m) long with a longest span of 37 ft (11.3 m) and a deck 26 ft wide.

Who owns TR 135 over Felky Slough?

It is owned by the Town or Township Highway Agency.