US Bridges

TR 118 over Baker Run

Fair

Livingston County, Illinois · 2380 N 1400 E · Structure no. 053324600000000

Built
1948
77 years old
Condition
Fair
inspected November 2024
Type
Tee Beam
Concrete
Length
36 ft
1 main span
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR 118 over Baker Run is a concrete tee beam carrying TR 118 over Baker Run in Livingston County, Illinois. It was built in 1948, so it is 77 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 51 by 2046. The structure is 36 ft (11 m) long and 22 ft wide.

CarriesTR 118
CrossesBaker Run
Location2380 N 1400 E
RouteCounty Highway 0
Coordinates40.97284, -88.66289
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating53.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length36 ft (11 m)
Longest span35 ft (10.7 m)
Deck width22 ft (6.8 m)
Roadway width20 ft (6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic51 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR 118 over Baker Run built?

It was built in 1948, making it 77 years old in 2025.

What condition is TR 118 over Baker Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does TR 118 over Baker Run carry?

About 50 vehicles per day (2023 count).

How long is TR 118 over Baker Run?

The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 22 ft wide.

Who owns TR 118 over Baker Run?

It is owned by the Town or Township Highway Agency.