Ill 17 FAP 649 over Prairie Creek
FairLivingston County, Illinois · 1 MI E of Ill 23 · Structure no. 053016000000000
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 80 ft
- 1 main span
- Daily traffic
- 1,800
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Ill 17 FAP 649 over Prairie Creek is a steel stringer/multi-beam or girder carrying Ill 17 FAP 649 over Prairie Creek in Livingston County, Illinois. It was built in 1989, so it is 36 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,800 vehicles a day, roughly 7% of them trucks, projected to reach 1,818 by 2046. The structure is 80 ft (24.4 m) long and 35 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ill 17 FAP 649 over Prairie Creek built?
It was built in 1989, making it 36 years old in 2025.
What condition is Ill 17 FAP 649 over Prairie Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Ill 17 FAP 649 over Prairie Creek carry?
About 1,800 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Ill 17 FAP 649 over Prairie Creek?
The structure is 80 ft (24.4 m) long with a longest span of 76 ft (23.2 m) and a deck 35 ft wide.
Who owns Ill 17 FAP 649 over Prairie Creek?
It is owned by the State Highway Agency.