I-55 NB over Vermilion River
FairLivingston County, Illinois · 1.5 M N of Il 116 · Structure no. 053012900000000
- Built
- 1975
- 50 years old, rebuilt 2014
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 404 ft
- 4 main spans
- Daily traffic
- 10,900
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-55 NB over Vermilion River is a steel continuous stringer/multi-beam or girder carrying I-55 NB over Vermilion River in Livingston County, Illinois. It was built in 1975 and reconstructed in 2014, so it is 50 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,900 vehicles a day, roughly 36% of them trucks, projected to reach 10,252 by 2046. The structure is 404 ft (123.1 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-55 NB over Vermilion River built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2014.
What condition is I-55 NB over Vermilion River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does I-55 NB over Vermilion River carry?
About 10,900 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is I-55 NB over Vermilion River?
The structure is 404 ft (123.1 m) long with a longest span of 110 ft (33.5 m) and a deck 42 ft wide.
Who owns I-55 NB over Vermilion River?
It is owned by the State Highway Agency.