US Bridges

Ill 116 over I-55

Fair

Livingston County, Illinois · 1 MI W of Pontiac · Structure no. 053011600000000

Built
1974
51 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
251 ft
2 main spans
Daily traffic
11,000
2023 count
Owner
State
State Highway Agency

About this bridge

Ill 116 over I-55 is a steel continuous stringer/multi-beam or girder carrying Ill 116 over I-55 in Livingston County, Illinois. It was built in 1974, so it is 51 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,000 vehicles a day, roughly 8% of them trucks, projected to reach 9,494 by 2046. The structure is 251 ft (76.5 m) long and 92 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesIll 116
CrossesI-55
Location1 MI W of Pontiac
RouteState Highway 116
Coordinates40.87339, -88.67117
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59.6 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length251 ft (76.5 m)
Longest span99 ft (30.2 m)
Deck width92 ft (28 m)
Roadway width71 ft (21.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2023)
Projected traffic9,494 by 2046
Trucks8%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ill 116 over I-55 built?

It was built in 1974, making it 51 years old in 2025.

What condition is Ill 116 over I-55 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Ill 116 over I-55 carry?

About 11,000 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Ill 116 over I-55?

The structure is 251 ft (76.5 m) long with a longest span of 99 ft (30.2 m) and a deck 92 ft wide.

Who owns Ill 116 over I-55?

It is owned by the State Highway Agency.