US Bridges

TR-2 over Reddick Run

Fair

Livingston County, Illinois · 0.97 MI S of Ch 25 · Structure no. 046325400000000

Built
1969
56 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
75
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

TR-2 over Reddick Run is a prestressed concrete box beam or girders - multiple carrying TR-2 over Reddick Run in Livingston County, Illinois. It was built in 1969, so it is 56 years old, older than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75 vehicles a day, projected to reach 77 by 2046. The structure is 43 ft (13 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTR-2
CrossesReddick Run
Location0.97 MI S of Ch 25
RouteCounty Highway 0
Coordinates41.08234, -88.25036
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating30.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 15
Structure length43 ft (13 m)
Longest span40 ft (12.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2021)
Projected traffic77 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was TR-2 over Reddick Run built?

It was built in 1969, making it 56 years old in 2025.

What condition is TR-2 over Reddick Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does TR-2 over Reddick Run carry?

About 75 vehicles per day (2021 count).

How long is TR-2 over Reddick Run?

The structure is 43 ft (13 m) long with a longest span of 40 ft (12.2 m) and a deck 26 ft wide.

Who owns TR-2 over Reddick Run?

It is owned by the Town or Township Highway Agency.