US Bridges

Peru Road over Main Ditch

Fair

Lee County, Illinois · 0.65 MI N Amboy RD · Structure no. 052437200000000

Built
1982
43 years old
Condition
Fair
inspected January 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
125
2017 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Peru Road over Main Ditch is a prestressed concrete box beam or girders - multiple carrying Peru Road over Main Ditch in Lee County, Illinois. It was built in 1982, so it is 43 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 125 vehicles a day, projected to reach 126 by 2046. The structure is 61 ft (18.6 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesPeru Road
CrossesMain Ditch
Location0.65 MI N Amboy RD
RouteCounty Highway 0
Coordinates41.71724, -89.41033
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length61 ft (18.6 m)
Longest span59 ft (18 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2017)
Projected traffic126 by 2046
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Peru Road over Main Ditch built?

It was built in 1982, making it 43 years old in 2025.

What condition is Peru Road over Main Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Peru Road over Main Ditch carry?

About 125 vehicles per day (2017 count).

How long is Peru Road over Main Ditch?

The structure is 61 ft (18.6 m) long with a longest span of 59 ft (18 m) and a deck 24 ft wide.

Who owns Peru Road over Main Ditch?

It is owned by the Town or Township Highway Agency.