Town Line RD over Steward Creek
FairLee County, Illinois · 0.5 MI N Perry RD · Structure no. 052400800000000
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected January 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 81 ft
- 1 main span
- Daily traffic
- 125
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Town Line RD over Steward Creek is a prestressed concrete box beam or girders - multiple carrying Town Line RD over Steward Creek in Lee County, Illinois. It was built in 1980, so it is 45 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125 vehicles a day, projected to reach 126 by 2046. The structure is 81 ft (24.7 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Town Line RD over Steward Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is Town Line RD over Steward Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does Town Line RD over Steward Creek carry?
About 125 vehicles per day (2017 count).
How long is Town Line RD over Steward Creek?
The structure is 81 ft (24.7 m) long with a longest span of 79 ft (24.1 m) and a deck 24 ft wide.
Who owns Town Line RD over Steward Creek?
It is owned by the Town or Township Highway Agency.