US Bridges

FAS 178 Paw Paw RD over Br of Willow Creek

Fair

Lee County, Illinois · 4 MI N of Paw Paw · Structure no. 052351300000000

Built
2012
13 years old
Condition
Fair
inspected February 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
41 ft
1 main span
Daily traffic
250
2022 count
Owner
County
County Highway Agency

About this bridge

FAS 178 Paw Paw RD over Br of Willow Creek is a prestressed concrete box beam or girders - multiple carrying FAS 178 Paw Paw RD over Br of Willow Creek in Lee County, Illinois. It was built in 2012, so it is 13 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 250 vehicles a day, roughly 14% of them trucks, projected to reach 354 by 2046. The structure is 41 ft (12.6 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFAS 178 Paw Paw RD
CrossesBr of Willow Creek
Location4 MI N of Paw Paw
RouteCounty Highway 0
Coordinates41.74735, -89.0002
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 25 or greater
Structure length41 ft (12.6 m)
Longest span39 ft (11.9 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2022)
Projected traffic354 by 2046
Trucks14%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAS 178 Paw Paw RD over Br of Willow Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is FAS 178 Paw Paw RD over Br of Willow Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does FAS 178 Paw Paw RD over Br of Willow Creek carry?

About 250 vehicles per day (2022 count), of which roughly 14% are trucks.

How long is FAS 178 Paw Paw RD over Br of Willow Creek?

The structure is 41 ft (12.6 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.

Who owns FAS 178 Paw Paw RD over Br of Willow Creek?

It is owned by the County Highway Agency.