Ch 12-TAMPICO RD over Green Riv Drainage
GoodLee County, Illinois · 6.5 MI SW of Harmon · Structure no. 052337100000000
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 35 ft
- 1 main span
- Daily traffic
- 100
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Ch 12-TAMPICO RD over Green Riv Drainage is a prestressed concrete box beam or girders - multiple carrying Ch 12-TAMPICO RD over Green Riv Drainage in Lee County, Illinois. It was built in 2013, so it is 12 years old, younger than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 22% of them trucks, projected to reach 76 by 2046. The structure is 35 ft (10.6 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ch 12-TAMPICO RD over Green Riv Drainage built?
It was built in 2013, making it 12 years old in 2025.
What condition is Ch 12-TAMPICO RD over Green Riv Drainage in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Ch 12-TAMPICO RD over Green Riv Drainage carry?
About 100 vehicles per day (2022 count), of which roughly 22% are trucks.
How long is Ch 12-TAMPICO RD over Green Riv Drainage?
The structure is 35 ft (10.6 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.
Who owns Ch 12-TAMPICO RD over Green Riv Drainage?
It is owned by the County Highway Agency.