US Bridges

CH-17 over Drainage Ditch

Good

Lawrence County, Illinois · 3 MI SW Russellville · Structure no. 051501400000000

Built
2005
20 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
300
2022 count
Owner
County
County Highway Agency

About this bridge

CH-17 over Drainage Ditch is a concrete culvert carrying CH-17 over Drainage Ditch in Lawrence County, Illinois. It was built in 2005, so it is 20 years old, younger than the Illinois average of 45.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 20% of them trucks, projected to reach 606 by 2046. The structure is 29 ft (8.7 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCH-17
CrossesDrainage Ditch
Location3 MI SW Russellville
RouteCounty Highway 0
Coordinates38.79226, -87.62499
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length29 ft (8.7 m)
Longest span13 ft (4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2022)
Projected traffic606 by 2046
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CH-17 over Drainage Ditch built?

It was built in 2005, making it 20 years old in 2025.

What condition is CH-17 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does CH-17 over Drainage Ditch carry?

About 300 vehicles per day (2022 count), of which roughly 20% are trucks.

How long is CH-17 over Drainage Ditch?

The structure is 29 ft (8.7 m) long with a longest span of 13 ft (4 m).

Who owns CH-17 over Drainage Ditch?

It is owned by the County Highway Agency.