TR-227A over England Ditch
FairLawrence County, Illinois · 1.5 MI SW Billet · Structure no. 051320000000000
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected January 2024
- Type
- Channel Beam
- Concrete
- Length
- 58 ft
- 2 main spans
- Daily traffic
- 275
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR-227A over England Ditch is a concrete channel beam carrying TR-227A over England Ditch in Lawrence County, Illinois. It was built in 1977, so it is 48 years old, older than the Illinois average of 45.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 275 vehicles a day, roughly 4% of them trucks, projected to reach 354 by 2046. The structure is 58 ft (17.7 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR-227A over England Ditch built?
It was built in 1977, making it 48 years old in 2025.
What condition is TR-227A over England Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does TR-227A over England Ditch carry?
About 275 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is TR-227A over England Ditch?
The structure is 58 ft (17.7 m) long with a longest span of 27 ft (8.2 m) and a deck 26 ft wide.
Who owns TR-227A over England Ditch?
It is owned by the Town or Township Highway Agency.